BUILDING RENOVATION
c/Barrero, Elche
Particular
Year: 2018
196
m2
Comprehensive management of this turnkey refurbishment, in a two-storey building, one house per floor, with independent access. It is a 1959 building. The structure was repaired and reinforced at certain points and the two floors, the roof, the facade and the dividing walls were completely rehabilitated.